Before & After

Madole Construction Before & After Photos

Click on a photo to enlarge.

Basement Wall Repair - Before & After

Take a look at this dramatic transformation! 👇

Our team, led by Larry and Austin, tackled a severely bowing basement wall with visible foundation cracks. The "before" shots show the damage—cracks, moisture, and structural compromise. The "after" images reveal a fully stabilized wall, reinforced with wall anchors, carbon fiber straps, 10” C-channel support, and protected with Xypex waterproofing for long-term durability.

 

Crawlspace Transformation - ICF Wall and Encapsulation

This crawlspace started as a dirt-filled void—now it’s a clean, usable space. We removed the soil with a conveyor system, poured a concrete pad, installed an ICF retaining wall, and fully encapsulated the area above the retaining wall for long-term protection and storage efficiency.

Basement Waterproofing with WaterGuard® Drainage System | Reno, NV

This project showcases the transformation of a damp, leaky basement into a dry, protected space using our proven WaterGuard® drainage system. Before installation, water intrusion was evident along the basement perimeter. Our team expertly installed the WaterGuard® below-floor drainage channel to collect water and redirect it to a sump pump system. The final result is a clean, dry basement ready for safe storage or future finishing.

Before & After: Helical Pier Installation

This project showcases the full helical pier installation process, from excavation alongside the foundation to final stabilization. Helical piers are driven deep into load-bearing soil to permanently support and stabilize settling foundations. Once installed, the area is backfilled and prepared for a clean finish—restoring structural integrity and providing long-term protection against future movement.

Sump Pump Gardnerville, NV

Before and after of a sump pump installation. Discreet covering so it's not even noticeable.

 

our service area

We serve the following areas

Nevada
  • Alamo
  • Amargosa Valley
  • Beatty
  • Blue Diamond
  • Boulder City
  • Bunkerville
  • Cal Nev Ari
  • Caliente
  • Carson City
  • Duckwater
  • Dyer
  • Gabbs
  • Gardnerville
  • Genoa
  • Glenbrook
  • Goldfield
  • Hawthorne
  • Henderson
  • Hiko
  • Indian Springs
  • Jean
  • Las Vegas
  • Laughlin
  • Logandale
  • Lund
  • Luning
  • Manhattan
  • Mesquite
  • Mina
  • Minden
  • Moapa
  • Nellis AFB
  • North Las Vegas
  • Overton
  • Pahrump
  • Panaca
  • Pioche
  • Round Mountain
  • Schurz
  • Searchlight
  • Silverpeak
  • Sloan
  • Smith
  • Stateline
  • Tonopah
  • Wellington
  • Yerington
  • Zephyr Cove
California Our Locations:

Madole Construction
18300 Joy Lake Rd
Washoe Valley, NV 89704
1-775-332-0700
Madole Construction service area
Service Area
Free Estimate