Finishing Touch
Finishing the concrete pour for the retaining wall at Euer Valley. Our crew smooths and levels the fresh concrete to form the support structure that will hold the bridge beams.
Concrete Pour Crew
Placing concrete inside the retaining wall forms at Euer Valley. The crew works the pump hose along the length of the wall to ensure an even, continuous pour. Close-up view of the retaining wall forms showing rebar placement and ties before the concrete pour. Precision here ensures proper reinforcement for the future bridge structure.
Project Overview in Euer Valley
Wide shot of the retaining wall construction in Euer Valley. The team prepares the abutment structure that will support the upcoming bridge beams
Finished Retaining Wall
Completed concrete retaining wall at Euer Valley. Forms have been removed, revealing a solid, clean structure ready to support the bridge beams and final site grading.
Crew With Pump Hose
The crew keeps spirits high while managing the concrete pump hose during the retaining wall pour. Strong teamwork keeps the project moving smoothly in the field.