Verification Nail Removed After Testing
Early-phase soil nail testing at the Virginia City K-8 site. A verification nail is extracted to evaluate load capacity and soil bond.
Close-Up of Tested Soil Nail
A detailed look at the verification nail after extraction. Soil adhesion and grout bond are assessed to confirm performance and validate the engineering design before full installation.
Torquing Soil Nail Bearing Plates
Sean Madole torques the soil nail bearing plates into position as part of the wall stabilization system. These plates secure each nail against the shotcrete wall, ensuring proper tension and structural performance across the soil nail grid.
Wall Preparation With Mesh & Drainage Panels
Reinforced mesh and drainage mats installed against the excavated slope. This system provides structural support for the shotcrete wall while promoting proper water management behind the wall.
The owner torques the soil nail bearing plates into position as part of the wall stabilization system. These plates secure each nail against the shotcrete wall, ensuring proper tension and structural performance across the soil nail grid.
Shotcrete being applied over reinforcement to build the retaining wall. This stage forms the structural facing that ties the soil nails together into a continuous, engineered system.
