Before - Driveway Issues
The original driveway had visible cracks and no drainage, which caused water to pool directly in front of the garage doors.

Excavation & Preparation
The crew began by cutting into the concrete and preparing the trench for the new channel drain system.

Channel Drain Placement
The channel drain sections were laid into place, aligned carefully to ensure proper water flow.

Connecting & Securing
Drainage pipes and grates were added, and the crew secured everything in place for long-term durability.

After - Completed Driveway
With the new channel drain installed and cracks repaired, the driveway is smooth, functional, and water no longer pools at the garage doors.

Pouring Concrete Support
Fresh concrete was poured around the channel drain system to lock it into position and reinforce the driveway surface.