
Decking Replacement in Progress
Out with the old: Aging wood decking removed and replaced to support long-term structural integrity.

Bridge Restoration Complete
Fully restored and ready for traffic - a safer, stronger bridge for South Reno.

Bridge Lift Using Polyurethane Foam
Precision lift in action: High-density polyurethane foam raises the structure 7 inches to restore proper elevation.

Concrete Pour for Enhanced Stability
Fresh concrete pour strengthens the bridge foundation and improves overall durability.